At a glance
  • Value £1 million
  • Client Scottish Canals
  • Sector Private
  • Duration 32 weeks

Case Studies

Rapid Water Courses – Pinkston

At a glance
  • Value £1 million
  • Client Scottish Canals
  • Sector Private
  • Duration 32 weeks

Brief

To provide a multi discipline reconfigurable facility to provide year round training for both white water sports enthusiasts and local Fire and Rescue.

Key Features

The patented pre-cast concrete base units complete with uni-strut rail installed to +/-2mm tolerances allow vehicles to be fixed down for fire and rescue training as well as the Rapidbloc system to create a canoe slalom. 3no 7 cumex pumps then push 21,000 litres of water per second down the course to recreate rapids.

Result

The project was completed on time and within budget ready for the grand opening on the 14 May 2014.

The following video shows the project from start to finish.