At a glance
  • Value £2.25 million
  • Client St Thomas More School
  • Sector Education
  • Duration 48 Weeks
  • Contract Design & Build

Case Studies

St Thomas More School

At a glance
  • Value £2.25 million
  • Client St Thomas More School
  • Sector Education
  • Duration 48 Weeks
  • Contract Design & Build

This refurb and extension project was the construction of a second-floor classroom block on top of an existing two storey classroom block at St Thomas More School in Blaydon.  Works were carried out whilst the existing classroom block was in use and so minimum disruption was paramount.

During this project the client extended our scope of works at second floor level to provide two additional classrooms and further changes were incorporated into our works due to unforeseen conditions encountered within the structure/fabric of the existing building

Key Features

  • Structural steel frame with in situ reinforced concrete floor slab
  • A single ply membrane roof covering
  • Curtain wall glazing system extending from the new second floor level to ground level
  • Zinc rain screen cladding system
  • New stairs and lift shaft block
  • Extension to the existing staircase from first to second floor level
  • New M&E services
  • Suspended ceilings, partitions, joinery works, flooring and decoration to all new blocks
  • Complete refurbishment of the existing ground and first floor level classrooms, offices, toilet facilities and circulation areas