This project was a full fit out of the new data room at EE.

Key Features

  • Gas type envelope and access floor
  • New air conditioning unit
  • Fire alarms and high sensitivity smoke detection
  • FM200 fire protection system
  • PDUs and associated BMS
  • Upgrade and install of new UPS
  • Large power upgrade
  • Work was conducted in a live environment
  • Complex access – there was a temporary opening inside the building on the first floor, and scaffolding over the internal plant
  • New UPS panel installed to interconnect into existing UPS in the power room