At a glance
  • Value £1.75 million
  • Client Witherslack Group
  • Sector Education
  • Duration 37 weeks
  • Contract Design & Build

Case Studies

The Grange

At a glance
  • Value £1.75 million
  • Client Witherslack Group
  • Sector Education
  • Duration 37 weeks
  • Contract Design & Build

The Grange project was the construction of a residential and educational facility for vulnerable children.

Key Features

  • The facility is built from a timber frame super structure
  • MUGA pitch constructed in the grounds
  • All M&E and IT services included
  • External landscaping
  • Creation of playing fields

Result

Works were carried out in a live environment whilst the existing school remained open.  The project was delivered ahead of programme, and under the guaranteed maximum price; providing significant savings for the client – The Witherslack Group.  The success of The Grange led to them working exclusively with Meldrum on their next development.